Template
Editorial Calendar Template
A working editorial calendar for B2B content teams: the columns worth tracking, a status workflow that stops pieces stalling, and a CSV you can open in Google Sheets, Excel or Airtable today.
What an editorial calendar is for
An editorial calendar is the single list of every piece your team plans to publish, who owns it, what stage it is at and when it goes live. It is not a social media scheduler (that handles posting) and it is not a content strategy (that decides what the calendar should contain). It is the place where the strategy becomes dated, owned work.
A good one answers three questions without anyone asking in chat: what is publishing this week, what is stuck, and which topics or funnel stages the quarter is ignoring. Every column in the template below exists to answer one of those.
The columns, and what goes in each
The CSV has these columns in this order, with three example rows to overwrite. Delete any column your team will never fill in: an empty column is worse than a missing one, because it makes the calendar look unreliable.
| Column | What goes in it | Example |
|---|---|---|
| Publish date | The day the piece goes live. Every other date in the row is worked out backward from this one. | Tue 12 Jan |
| Working title | A title that says what the piece promises. It can change; the promise shouldn't. | How to write a content brief |
| Status | Exactly one stage from the workflow below. No free text, so the calendar can be filtered. | Briefed |
| Content type | The format: how-to guide, comparison, explainer, case study, template, opinion. | Comparison |
| Pillar / cluster | The topic cluster the piece supports, so you can see at a glance whether one pillar is starving. | Content operations |
| Target keyword | The one search the piece is meant to win. Two rows with the same keyword is a warning sign. | how to write a content brief |
| Search intent | Informational, commercial, transactional or navigational: what the searcher wants to leave with. | Commercial |
| Funnel stage | Top, middle or bottom, so the quarter isn't all awareness pieces and no buying-stage content. | Middle |
| Writer | One named person accountable for the draft, in-house or freelance. | Freelance writer |
| Editor / approver | Who signs off. In regulated teams, list every required reviewer. | Managing editor |
| Brief link | Where the brief lives. A row with no brief link shouldn't move past Approved. | Shared drive link |
| Brief, draft and edit due | Three deadlines, counted back from the publish date using how long your own pieces actually take. | 15 Dec · 2 Jan · 7 Jan |
| Channels | Everywhere the piece will be distributed beyond the blog. | Blog; newsletter; LinkedIn |
| Distribution notes | What each channel needs: pull quotes, a sales one-liner, a newsletter blurb. | Pull two quotes for LinkedIn |
| Published URL | Filled in on publish day. It turns the calendar into an inventory you can audit later. | /posts/… |
| Refresh check | When to look at the piece again to decide whether to update, merge or retire it. | 12 Jul |
A status workflow that keeps pieces moving
Most calendars fail on the Status column: it fills up with “WIP”, “nearly there” and “waiting on Sam”. Use a fixed list, and give each stage an entry rule, so a piece can only move forward when it actually qualifies.
- Idea. Anyone can add one. It needs a working title and a target keyword, nothing else.
- Approved. The owner of the calendar agrees it fits the quarter's goal and doesn't duplicate an existing page.
- Briefed. A brief exists and is linked, and a writer and due dates are set.
- Drafting. The writer has started. The draft due date is now a commitment.
- In edit. The editor has the draft. Feedback goes in the draft, not in chat.
- Ready. Every required approver has signed off, and images, links and metadata are done.
- Scheduled. Loaded into the CMS with its publish date and time.
- Published. Live, with the URL recorded and distribution under way.
- Refresh due. The refresh-check date has passed: review the piece's performance and decide what happens to it.
In a spreadsheet, make Status a dropdown (in Google Sheets: Data → Data validation → Dropdown) so nobody can type a stage that isn’t on the list. If you work in a regulated industry, split Ready into one stage per required review; our guide to content approval workflows for regulated industries covers how.
Three views of the same calendar
Keep one sheet of rows and look at it three ways, instead of keeping three documents that drift apart.
- By publish date. The calendar view. Use it in planning to check the spread across pillars, content types and funnel stages, week by week.
- By status. The pipeline view. Use it in the weekly stand-up: anything sitting in the same stage since last week gets a decision, not a nudge.
- By writer.The workload view. Use it before you assign anything new, so one person isn’t holding five drafts while another holds none.
In Google Sheets or Excel these are filter views on the same tab; in Airtable or Notion they are saved views of the same table.
How to fill your first quarter
- Start from the quarter’s goal, not a topic list. Write down the one outcome the content should move this quarter. Our walkthrough of a quarterly content planning cycle shows how to set it.
- Set a cadence you can actually ship. Count what your team published last quarter, including the pieces that slipped, and plan to that number. Raise it once the calendar has held for a full quarter.
- Block the mix before the topics. Fill the Content type, Pillar and Funnel stage columns for every slot first. Only then put titles in them, so the mix is a decision rather than an accident.
- Give every slot one keyword. Check the Target keyword column for repeats before anything is approved; two pieces aimed at the same search compete with each other. Keyword clustering helps you group them.
- Work every deadline backward. From each publish date, set edit, draft and brief due dates using how long your last few pieces really took at each stage, not how long they should have taken.
- Brief before you assign. No row moves to Briefed without a brief linked. The content brief template for SEO articles gives you the fields, and the blog post template gives writers the shape to draft in.
- Leave slack.Keep a slot or two unassigned each month for timely pieces and for drafts that slip, so one late article doesn’t push the whole calendar.
Mistakes that make a calendar stop being used
- Planning titles a year out.Plan themes for the year, dated pieces for the quarter, and leave the next quarter’s rows as ideas.
- No single owner. Someone has to approve rows into the calendar and say no. Without that person it becomes a wish list.
- Status updated only in meetings.The writer moves their own row the moment it changes stage; the meeting reads the calendar, it doesn’t update it.
- Forgetting what’s already live. Fill in the Published URL and Refresh check columns, and the calendar doubles as your content inventory. When the check comes round, the guide to refreshing versus retiring posts helps you decide.
Spreadsheet or calendar tool?
A spreadsheet is enough while one person owns the calendar and the team is small enough to talk every week. It stops being enough when you need approvals recorded, assets attached to rows, or many freelancers updating their own pieces. Our comparison of content calendar tools for small marketing teams covers what each kind of tool is good for. Check each vendor’s own pricing page for current prices, as they change often. The columns above import into any of them.
Questions
What is the difference between an editorial calendar and a content calendar?
Teams use the terms loosely. In this template, the editorial calendar covers the production of each piece from idea to publish and refresh; a content or social calendar usually covers when finished pieces are posted on each channel. The Channels and Distribution notes columns link the two.
How far ahead should an editorial calendar be planned?
Far enough that every piece publishing in the next few weeks already has a brief and a writer, and no further in detail than you can keep accurate. For most teams that means one quarter of dated rows.
Can I use this template in Notion, Airtable or Excel?
Yes. It is a plain CSV, so every one of them imports it. After importing, turn Status, Content type and Funnel stage into single-select fields so the values stay consistent.